Harbour Bridge could get cycleway, footpath

Print

Thu, 11 Aug 2011 6:00p.m.

3 News Video On Demand
Rate:
0 ratings
Auckland cyclists are on the verge of an historic breakthrough over their right to bike over the iconic Harbour Bridge.
Auckland cyclists are on the verge of an historic breakthrough over their right to bike over the iconic Harbour Bridge.
Become a fan of 3 News on Facebook and on Twitter.

Post a Comment

Before commenting, please take the time to read our moderation guide


(Won't be published)



Comments

12 Aug 2011 03:00a.m.

Mat wrote:

Waste of money and waste of time.. Yea 30 years time, the issue will probably be forgotten lolz

11 Aug 2011 09:47p.m.

Chris wrote:

Best of luck getting their money back through tolls. I WILL NOT BE FUNDING THIS THROUGH RATES END OF STORY.

11 Aug 2011 09:14p.m.

Jax wrote:

You're not wrong Alan. Well overdue. The clowns that were in charge of Auckland 40+years ago made many poor decisions regarding city layout, public transport and the harbour crossings....or lack of. Not sure if the current clowns are much better.

Jer - Cycling over the Syndey harbour bridge is awesome. And Sydney has windy days. Having a cycle lane across Auckland harbour bridge would prove very popular toll or not. A lot of people would use the cycle lane to get out of their cars. The cyclist losers would still be confined to Tamaki drive running red lights.

11 Aug 2011 08:42p.m.

BW wrote:

$5 each way??? are you joking!! plus $2 for hop cards...

11 Aug 2011 07:36p.m.

Joseph sequeira wrote:

the cycle project is a replica of "BUILT- OPERATE-TRANSFER"straigies used in asian countries like India (Mumbai in perticular).its a good sample to follow 4 bigger projects

11 Aug 2011 07:33p.m.

Jer wrote:

Hahaha, I can't wait to see them get blown off the side by the massive gusts of wind. Now we have to deal with these cylist losers on the motorway too, yippee

11 Aug 2011 06:38p.m.

alan wrote:

Best of Luck\The use of the bridge for Pedestrians or cyclesis about 30 to 40 years overdue a justification for the lscintelligence by those who built the bridge
But this is another waste of money and will be dropped into public funding as soon as they realize that they will not make money


Sorry Kiwis think first
the track record is not good

11 Aug 2011 06:10p.m.

Jon wrote:

And what happens to the company the does the harbour bridge walks and bungy jumps do you think they will take a massive hit.

Related Videos